For a tiling takeoff, send more than the floor plan. Include the current finish plans, schedules, interior elevations, relevant wet-area details, specifications and revisions, along with the tiling scope you need measured and your tender deadline.
You may already have a tiling package open and a tender moving, but that does not always mean the scope is ready to measure. The information that defines the job can sit across several parts of the drawing set, and missing one of those references can change what the takeoff needs to cover.
When we receive a project at RAPID Takeoffs and Estimating, the first step is understanding exactly what you are pricing and where that scope is shown. That gives us a much clearer basis for preparing your Tiling Take-Off before we start working through the quantities.
The Floor Plan May Not Show the Full Tiling Scope
A floor plan can show us where the bathroom, ensuite or tiled area sits, but it does not always show the full extent of the tiling package. Wall finishes, feature areas, tiling heights or changes in finish can be defined somewhere else in the drawings.
That is why we do not want to rely on the floor plan alone when wall tiling forms part of the scope. We need to see the parts of the documentation that show how those areas are actually meant to be treated.
If that information sits in an elevation or enlarged detail, that is what gives us the context needed before we start measuring.
Send the Finish Information With the Plans
A tiled area can be easy to spot on the drawings while the finish itself is identified somewhere else. We may see a finish code on plan, then need the schedule or specification to establish what that code actually refers to.
If your project uses several tile finishes, send the documents that define them with the drawing set. That gives us the information needed to match the right finish to the right area before we start measuring.
We do not need every document in the tender package. We need the ones that actually define the tiling scope you want priced.
Interior Elevations Can Change What Needs Measuring
A floor plan might tell us that a bathroom is tiled, but the interior elevations can show how far that tiling actually runs and where the finish changes.
That matters when wall tiling is part of the package. An elevation can reveal a feature wall, a different tile finish, a tiled niche, an opening or a change in height that is not obvious from plan view alone.
If those elevations are available, include them with the takeoff request. They can materially change what needs to be measured and how the tiling scope is understood before we start working through the quantities.
Tell Us Which Package You Are Actually Pricing
A full drawing set can show far more tiling than you are actually tendering. Before we start, we need to know where your package begins and ends.
Your scope might only cover:
- One level or stage
- Selected bathrooms or wet areas
- A nominated building
- Particular tile finishes
- Specific rooms or tenancy areas
If you are only pricing part of the project, tell us that when you send the drawings through. We should not have to infer the tender boundary from the plans themselves.
The clearer that package is at the start, the easier it is for us to keep the takeoff focused on the work you actually need priced.
If Something Is Missing, Tell Us
Not every tender package arrives complete. A finish schedule may still be pending, an elevation might not have been issued yet, or you may know that another drawing revision is coming.
Flag the gap when you send the job
If something relevant to the tiling scope is missing, tell us upfront. That gives us a chance to review what is available and identify whether the takeoff can proceed as supplied or whether we need something else first.
A known gap is much easier to deal with than discovering halfway through the takeoff that part of the scope was defined in a document we never received.
Make Sure We Have the Latest Addenda and Revisions
A tiling takeoff can change if a later drawing issue alters a room layout, finish code, wall extent or wet-area detail. If revised information has been issued, we need to know which version is current before we rely on it.
| Send us | Why it matters |
| Latest drawing issue | Confirms which plans we should measure from |
| Current finish schedules | Helps us match finishes to the right areas |
| Relevant addenda | Flags changes that may not appear on the original set |
If a revision arrives after we have started, clearly identify it when you send it through so we can review whether anything already measured is affected.
Tell Us How You Need the Quantities Returned
The takeoff needs to be useful for the way you are pricing the job, not just technically complete.
Think about how you will use the quantities
You might need the tiling separated by:
- Room or wet area
- Level or building
- Tile finish
- Stage or pricing package
- Another agreed project breakdown
For example, if two finishes are being priced separately, it helps to know that before we start rather than after the quantities have already been grouped together.
Tell us how you need the takeoff structured when you send the package through. We can then review that requirement alongside the scope and drawings before measuring begins.
Include the Tender Deadline
If the takeoff is for a live tender, send us the actual due date when you send the package through.
That lets us review the scope, available documents and timing together before the job starts. A project due next week may need to be handled differently from one due tomorrow, especially if drawings are still changing or information is missing.
The date matters because it affects what can realistically be reviewed before measuring begins.
Before You Hit Send
Before sending your tiling package through, check that you have included or identified:
- Current floor plans
- Relevant finish plans
- Finish schedules or legends
- Interior elevations where wall tiling is included
- Enlarged wet-area drawings where relevant
- Relevant specifications and details
- Current addenda and revisions
- The tiling scope you want measured
- How you want the quantities broken down
- Your tender or quotation deadline
You do not need to organise the drawing set for us. What matters is that we know which information is current and which part of the tiling package you want us to measure.
Pricing More Than the Tiling Package?
If the same project includes other finishes, we can also help with:
Painting Take-Offs
For painting quantities across the relevant project scope.
Flooring Take-Offs
For flooring packages that need to be measured separately from tiling.
Rendering Estimates
For projects that also include rendering work within the tender package.
FAQ
Yes. The takeoff can be prepared from the project documentation and scope you provide. Supplier pricing can be handled separately once you have the quantities you need to price the package.
Our tiling takeoff work is focused on measuring the quantities required from the supplied project documents. If you need a particular output for your own pricing process, tell us when you send the job through.
Yes, where both are included in the tiling scope and supported by the project documentation. Wall tiling often relies on elevations or details as well as the floor plans, so those drawings should be included where relevant.
Yes. Send the current project documents, the tiling package you are pricing and the tender deadline so we can review what is required before the takeoff starts.
Have a Tiling Package Ready to Send?
Send us the current project documents, the tiling scope you need measured and your tender deadline. We’ll review what you have and confirm what is needed to get your Tiling Take-Off underway.